?>
?>
?>
?>
?>
?>
?>

Projects

JEDDAH FORMULA 1

After-Race Concerts (ARC)

It was announced that the city of Jeddah would host the inaugural Saudi Arabian Grand Prix.

The announcement created a huge amount of excitement throughout the region, as the Middle East secures another high-profile motorsport event.

All Events Services joined in the excitement when contracted by MDL Beast to supply the After-Race Concert (ARC), to supply a full turnkey solution for temporary structures.​

For more details on the AES build, please download the Jeddah F1 case study below:

KISS GOODBYE

Live streamed concert Atlantis Dubai

Legendary glam rock band Kiss rock in the new year by performing a supersized live pay-per-view concert from the Atlantis Dubai. The one off show, was one of the biggest productions the band has played in their 50 year career.

All Events Services designed and built arguably one of the largest entertainment stages the Middle East has ever seen for the spectacular event.

Contracted by CDS to supply a full temporary structure solution for the Kiss Goodbye NYE show, AES put the thinking caps on for the design of the main stage, where the main brief was… BIG!

For more details on the AES build, please download the KISS case study below:

MDL Beast 3-Day Music Festival

Riyadh

All Events Services look back to the iconic MDL Beast Music Festival, which took place in Riyadh.

The 3-day mega event broke attendance records with over 400,000 visitors. The world’s finest DJs, Tiesto, Steve Aioki, Black Coffee and Martin Garrix, headlined while Saudi Arabia’s local talent, including Baloo, Varoo and Vinyl Mode, played on the side stages.

Contracted by Sela Sport, AES provided a full scope of products for the event, which included 4 of the 5 stages, DJ Bandroofs, FOHs, delay towers, ground support stage, truss structures, scaffold walls, scaffold towers, platforms and much more.

For more details on the AES build, please download the MDL Beast case study below:

CIRQUE DU SOLEIL

Saudi 88th National Day

To mark Saudi National Day, the General Entertainment Authority presented one of the largest custom made events by the world renowned company Cirque du Soleil. All Events Services were contracted as the main structural supplier for the iconic event.

For more details on the AES build, please download the CDS case study below:

IDEX Opening Ceremony

All Events Services were contracted to supply over 25,000 cubic metres of scaffolding for the opening ceremony of the 14th edition of the International Defense Exhibition & Conference (IDEX) in Abu Dhabi.

For more details on the AES build, please download the IDEX case study below:

UFC 242

15,000 Capacity Arena

Please take a look at the fantastic UFC event.

AES supplied a full arena venue which included the roof structure, grandstand seating, Concert Stage, VIP boxes and much more.

For more details on the AES build, please download the UFC case study below:

Al Diriyah Festival

Formula E & Music Concerts

AES supplied, for the second year, the full concert overlay for the 2019 Saudia Diriyah E-Prix after race concerts in Riyadh.

The, never seen before, unique stage was designed and engineered by AES. The multi-tiered stepped pyramid styled stage was rigged with over 550 sq.m of LEDs and had over 30T of AV rigged in the roof.

AES specialise in creating and building custom-made structures to work alongside our client’s vision.

For more details on the AES build, please download the Al Diriyah Festival case study below:

Diriyah Gate

Royal Inauguration

All Event Services supplied the full structure overlay for the Diriyah Gate Inauguration back.

Produced by Executive Visions Inc, attended and sanctioned by His Majesty King Salman and HRH Crown Prince Mohamed Bin Salman Al Saud, the ceremony celebrated the archeological restoration of the UNESCO World Heritage Site in Diriyah.

AES supplied many structures for the event, such as: Covered grandstand, projection tower, light towers, power platforms, orchestra platform, press & VIP decks, fencing and much more.

For more details on the AES build, please download the Diriyah Gate case study below:

Get a Quote: +(971) 503405266